You are here:

Direct Negotiation R8-RPS-R8-TOR

REGION 8 AGGREGATED RPS SUPPLY DIRECT NEGOTIATION

TERMS OF REFERENCE

A. GENERAL INFORMATION

1. NAME OF UTILITIES:

NORTHERN SAMAR ELECTRIC COOPERATIVE, INC. (NORSAMELCO) SAMAR I ELECTRIC COOPERATIVE, INC. (SAMELCO I)

SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO II)

DON ORESTES ROMUALDEZ ELECTRIC COOPERATIVE, INC. (DORELCO) LEYTE II ELECTRIC COOPERATIVE, INC. (LEYECO II)

LEYTE III ELECTRIC COOPERATIVE, INC. (LEYECO III) LEYTE IV ELECTRIC COOPERATIVE, INC. (LEYECO IV) LEYTE V ELECTRIC COOPERATIVE, INC. (LEYECO V)

SOUTHERN LEYTE ELECTRIC COOPERATIVE, INC. (SOLECO) BILIRAN ELECTRIC COOPERATIVE, INC. (BILECO)

2. AREA TO BE SERVED: Grid

3. CURRENT YEAR OF FILING: 2023

B. REQUIREMENTS

1. GENERAL SUPPLY DESCRIPTION

1.1 Purpose of Procurement: For RPS Compliance

1.2 Supply Type: Firm/Non-Firm

1.3 Supply Side: Baseload

2. TERMS OF SUPPLY SERVICES

2.1 Contract Capacity (MW/Year):

      Type of Technology: Limited to eligible renewable energy only.

Direct-Negotiation_R8-RPS-R8-TOR.pdf